Please use this identifier to cite or link to this item: http://dspace.aiub.edu:8080/jspui/handle/123456789/2062
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIslam, Md. Robiul-
dc.contributor.authorRahman, Md. Nazibur-
dc.contributor.authorMannan, Mohammad Abddul-
dc.date.accessioned2024-01-16T10:43:06Z-
dc.date.available2024-01-16T10:43:06Z-
dc.date.issued2016-
dc.identifier.citationMd. Robiul Islam, Md. Nazibur Rahman, Mohammad Abdul Mannan, “Study of Wind Power in Different Parts of Bangladesh”, International Research Journal of Engineering and Technology (IRJET), Vol. 3, Issue 9, pp. 1290-1299, 2016.en_US
dc.identifier.issn2395–0072-
dc.identifier.urihttp://dspace.aiub.edu:8080/jspui/handle/123456789/2062-
dc.description.abstractDue to the reduction of available fossil energy resources and also safety problems and high cost of nuclear energy, conventional sources of energy are depleting and emphasis is now focused on renewable energy. The number of researches related to renewable energies, especially wind energy is increasing. Wind energy is a renewable source of great potential. It's cheaper and requires less maintenance, but there are problems associated with him. The wind turbine (WT) associated with the issue of the unpredictable nature of wind. It also makes it easy to get a constant frequency and constant voltage from wind turbines driven by the variable speed. Bangladesh has to deal with the increasing demand of electricity. With the world’ increasing trend of utilization of wind energy and the reduced costs of renewable energy technology and improved efficiency and reliability, wind energy can be good alternative solution to Bangladesh’s dependency on natural gas which gets more expensive in the future. Bangladesh has a projected electricity demand of 12,229 MW in year 2016; only 100 MW of that huge demand is projected to come from wind power sources. It is come to be deployed in the coastal area and islands. But there are other places of interest for wind power generation, which could be good means for solving the huge power crisis and problem. This paper exposes Prospect and feasibility of wind power in different parts of Bangladesh. And also discuss Wind speed in different local in Bangladesh, feasibility of different scale of wind power generation. Wind speed average 5 m/s to 3.5 m/s. wind turbines could be installed and tested in locations such as St. Martins Island, Cox’s Bazar, Patenga, Bhola, Barguna, Dinajpur, Thakurgaon and Panchagar.en_US
dc.language.isoenen_US
dc.publisherFast Track Publicationsen_US
dc.subjectBangladeshen_US
dc.subjectWind Poweren_US
dc.subjectFeasibilityen_US
dc.subjectProspecten_US
dc.subjectrenewable energyen_US
dc.subjectwind power Generationen_US
dc.titleStudy of Wind Power in Different Parts of Bangladeshen_US
dc.typeArticleen_US
Appears in Collections:Publications From Faculty of Engineering

Files in This Item:
File Description SizeFormat 
53J_Mannan_IRJET.pdf183.22 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.